How long is the production cycle of the luminous letters on the roof? how much time is required?

2019-06-28
Share:

The production process of the luminous letters on the roof has been introduced in the previous article. The knowledge related to transportation and installation is also involved. Every day, I will not bother to talk about the relevant knowledge of the luminous letters on the roof, but also help the users in need. This industry and related products, also by the way to understand the strength of the product COSUN SIGN, on the other hand, these content around the product word "luminous letters on the roof" is also author for the layout of keywords, since it is the main core Words, then you have to dig out all the technical points related to this core word, and then break each. The main point of our excavation today is the topic of the production cycle of the luminous letters on the roof. It can also be described as “how long does it take to make the luminous letters on the roof?” No matter how it is described, when someone asks this question, this customer will be inseparable. Now, there are so many luminous letters on the roof in the country, who can explain this problem clearly, and the probability is that you can get this order. Therefore, COSUN SIGN will answer the "luminous letters on the roof" in detail as a manufacturer today. How long does the cycle last?


How long is the production cycle of the luminous letters on the roof? how much time is required?


Through a number of previous articles, we have had a preliminary understanding and understanding of the related production process of the luminous letters on the roof. It is understood that the materials used to make the luminous letters on the roof are usually metal materials, and understand why most of the luminous letters on the roof are the red one also has a preliminary understanding of the installation and installation process of the luminous letters on the roof through the way of text and text. Looking back here, let us answer the question “How long is the production cycle of the luminous letters on the roof?” This question has already been counted. How to calculate the length of time period, which needs to be analyzed from the perspective of process difficulty. In general, a rough estimate of the production cycle can be made according to the size of the luminous letters on the roof.


For the luminous letters on the roof of the building below 1 meter, we know that the luminous letters on the roof below 1 meter are suitable for buildings within 5 floors, due to the distance from the crowd. The size of the luminous characters is small, as long as the thickness of the metal shell is sufficient, it is not necessary to make a skeleton to support, or to weld some relatively simple brackets for reinforcement, so the process is difficult to implement, for large logo design manufacturers, The production cycle of such the luminous letters on the roof can be controlled between 1 and 3 days.


For the luminous letters on the roof between 1 m and 2 m, generally the luminous letters of this size must be made of metal shells, and a certain number of stiffener skeletons need to be welded inside the shell to handle the paint on the shiny shell. It also needs to meet higher standards, because the 1 to 2 meter size luminous letters on the roof is usually installed on the top of a relatively high building. The luminous letters shell is subject to environmental factors and needs to be prepared in advance. More, so the luminous letters on the roof production cycle will be relatively long, large manufacturers also need between 3 days and 7 days, there may be special requirements may be more than 7 days, of course, the specific details still need to see details and process requirements.


For a large building with a size of more than 2 meters, a stroke of this size of the luminous letters on the roof may be higher than the height of an adult. After all, we are less than 2 meters tall, so operate this large building. The difficulty of the the luminous letters on the roof can be imagined. It is very important to build a large skeleton to support a large number of metal strokes, and the skeleton can not affect the overall appearance and aesthetics of the shell. From the previous stage of laser cutting of sheet metal to edge cutting, edge bending, welding, grinding, punching, painting, dusting, light source installation, assembly testing, etc., each step of the work and process is difficult to achieve Far higher than the small size of the luminous letters on the roof, and this luminous letters on the roof are usually located at an altitude of tens of meters or even hundreds of meters, and the details to be considered far exceed the standards of low-rise buildings, so this is more than 2 the luminous letters on the roof production cycle of rice is generally more than 7 days.


After the above analysis, we have a clearer understanding of the question of how long it takes to create a cycle of luminous letters on the roof. Different lighting materials have different processes and different materials, and the time required is different. In fact, it is also very simple to understand. For example, one of the painting process links, for responsible senior label manufacturers, the painting of the metal shell of the luminous shell needs to be polished, decontaminated, primed, dried, painted, dried. In the other stages, the process cycle of each subdivision is incompressible; in the baking stage, the baking time in the baking room and the process of natural cooling after baking are strictly in accordance with relevant regulations. This is a large-scale sign. Responsible performance of the manufacturer is also an important reference factor for directly determining the production cycle of the luminous letters on the roof.


From this point of view, the production cycle of the luminous letters on the roof is not as long as possible, the manufacturer that can not guarantee the delivery period may be technically or not enough. If the promise is made, the task should be completed according to the agreed period of quality and quantity; Instead, It is not the shorter the production cycle, the better, because the roof printing process is there, the process steps can not be saved, otherwise it is to cut corners, is another irresponsible.